IPC OUTLOOK Logo
The Knowledge and Know-how Connection
IPC OUTLOOK Logo
May 21, 2012
BGA Rework Flux Recommendation
Ask the Experts
SMT Components Popping Off During Reflow
Board Talk
Rework or Repair?
Ask the Experts
Rules for Reusing Electronic Components
Board Talk
Alternative to Dead Bug Rework
Production Floor
Consensus for Baking Prior to Rework?
Board Talk
Dip Solder Paste for BGA Rework
Production Floor
Is Pre-Bake Standard for Rework?
Ask the Experts
Can We Skip Cleaning After Rework?
Board Talk
Reliability Assessment of Reballed BGAs
Analysis Lab
More Related Programs  »



HASL vs. Immersion Gold
We make electronic equipment used in corrosive environments. Do you recommend use ...
Cleaning with Sodium Bicarbonate
Is there an affect on PCBA long term reliability for assemblies cleaned ...
BGA Component Moisture Exposure
We mistakenly assembled boards using BGA components with moisture tags that show ...
Mixed Technology - Which First
We are assembling a mixed technology board. We assemble the through hole ...
Insufficient Plated Hole Fill with Electrolytic Capacitors
We are having problems achieving the minimum hole of 75% on electrolytic ...
BGA Rework Flux Recommendation
Is there a flux we should evaluate when we replace BGA components? ...
What is Causing Oxidation?
After 2-3 months of service in the field we are noticing the ...
Rework or Repair?
We often need to strip solder splash contamination off gold edge contacts ...
Proper DI Water Resistivity for PCB Cleaning?
What the proper resistivity reading for DI water when cleaning electronic assemblies ...
Cold Solder Joints on 0603 Components
We encountered cold solder joints on 0603 components on a batch of ...
More Ask the Experts  »
Reworking Circuits Under a BGA Component
Reworking Circuits Under a BGA Component
Is it possible to add circuits under leadless devices such as BGA's? Would the part still be able to be installed through the normal assembly process?

Is it possible to add circuits under leadless devices such as BGA's?

Would the part still be able to be installed through the normal assembly process?


E. F.


Expert's Panel Responses

It would depend upon the type of BGA and the component you wanted to place underneath it. For example; if you had a plastic BGA and the center grids were vacant, you could place components under this BGA. You would have to ensure that they would not interfere with the post reflow height or clearance of the chip (which is in the .016"-.020" range).

In a ceramic BGA, you would have additional clearance as the solder balls are not melt-able and the post reflow height is usually .030" or higher.

Either way this is not a very common practice and most designers leave the space under a BGA for trace routing and thermal control.

image
Edward Zamborsky
Regional Sales Manager, OK International Inc.
Mr. Zamborsky serves as one of OK's technology advisers to the Product Development group. Ed has authored articles and papers on topics such as; Low Volume SMT Assembly, Solder Fume Extraction, SMT Rework, BGA Rework, Lead Free Hand Soldering, Lead Free Visual Inspection and Lead Free Array Rework.

Any circuits added due to repairs has to address what circuitry it is being removed or replaced. If the defective circuitry is removed, the replacement should be the same thickness and should not impact the installation of a BGA component.

image
Leo Lambert
Vice President, Technical Director, EPTAC Corporation
At EPTAC Corporation, Mr. Lambert oversees content of course offerings, IPC Certification programs and provides customers with expert consultation in electronics manufacturing, including RoHS/WEEE and lead free issues. Leo is also the IPC General Chairman for the Assembly/Joining Process Committee.

Absolutely, it is possible to rework and add circuits under leadless devices like BGA's while maintaining the ever critical flatness characteristics required for successful BGA placement.

This is a modification we perform successfully on a regular basis. However I must caution, this is one of the more challenging rework and repair procedures we encounter. This rework can be difficult because it requires demonstrated skill in multiple disciplines.

Some of the more important capabilities required include BGA removal & replacement, X-Ray inspection, proficiency in milling & cutting of PCB's, the ability to add new circuit components like BGA pads, copper tracks, and jumper wires. The technician's focus on precision and quality of workmanship is paramount to successful results. The complexity of this type of rework and repair is directly proportional to BGA site array density.

If you would like to investigate the procedures in more detail, see BGA ECOs - Nifty Solution or Rework Nightmare?, an article found on the Circuit Technology Center web site. This article details step by step procedures required for a rework/repair of this nature.

Performing repairs/rework under surface mount components to resolve ECO issues is far more common than you might think. Although it is a challenging procedure, it can be done reliably and safely by following established proven procedures. Our experience has demonstrated that skill, attention to detail and patience yields robust, reliable results.

If a program's time to market and ultimate success has stalled because prototypes or production modules need rework or repair under a surface mount component go for the rework or repair. There is no better way to salvage your costly investment and keep your program on schedule.

image
Peter Vigneau
General Manager, Circuit Technology Center, Inc.
Mr. Vigneau is the General Manager of Circuit Technology Center, a world-leader in the repair and rework of populated and non-populated circuit boards. Peter has over 30 years of experience in the electronics industry.
Print  »
At "Ask the Experts" we submit challenging questions to our panel of distinguished experts. You provide the questions and they provide the answers.

Ask the Experts Questions | Ask the Experts Panel
Submit A Questions | Join the Panel
Comments  »
Use the form below to submit a comment.

No comments have been submitted.
Submit A Comment  »
This comment is about the program:
Reworking Circuits Under a BGA Component

The is a general comment.
Your Name
Company
E-mail
Country
Comments
Discussion of pricing, recommendations for specific products or advertisements are not appropriate. All comments are reviewed prior to posting. You must include your full name to have your comments posted. We will not post your email address, we request your email address so we can notify you if your comments are posted.
Authentication
Please type the number displayed into the box. If you attempt to submit information and receive an error, you may need to refresh the page and insert the information again.
Today's Sponsor
Today's Sponsor
IPC Member Spotlight   »
Featured Sponsors   »
IPC OUTLOOK Logo IPC — Association Connecting Electronics Industries
3000 Lakeside Drive, 309 S, Bannockburn, IL 60015
Phone: 978-478-5112 | Fax: 843-682-4255
Sandy Gentry, Editor | Kim Sterling, Publisher
About IPC Outlook  |  Contact Us  |  Privacy Policy  |  Terms of Use  |  Sponsorships

Views: 494